Agenda Item
Meeting Date:
2/12/2024 - 6:30 PM  
Category:
New Business  
Type:
Action  
Subject:
Herndon Walkway Repair  
Board Goals:
 
Enclosure:
Bid Tab
Draft Contracts – A101 & A201
Bid Proposal Packet, Axis Construction Group
Bid Package – Specifications
Bid Package – Drawings
 
File Attachment:
23173 Herndon Walkway Renovation 100 Pct Specs OTB.pdf
23173 Herndon Walkway Renovation - 100 Pct Dwgs OTB.pdf
23173 Raytown Herndon Walkway Renovation Bid Tab, Final.pdf
A101-2017_23173_HerndonWalkway Renovation_Axis_24.01.30.pdf
A201-2017_23173_HerndonWalkway Renovation_Axis_24.01.30.pdf
BidProposal_23173_Herndon_Axis.pdf
 
Background & Rationale:
The second story walkway at the north end of Herndon Building B is deteriorating and in need of repair.  
Budget to be Charged:
MACCO Grant

Missouri Area Career Center Opportunity Grant
 
Motion
I move that the Board of Education approve Axis Construction for the work at Herndon Career Center with a base price of $117,035.00, contingency of $11,703.50 for a total not to exceed $128,738.50.  
Approvals:
Recommended By:
Signed By:
Josh Hustad - Director of Facility Operations
Signed By:  
Penelope Martin-Knox - Superintendent